Thailand OPENE Project- KKT(Khon Kaen Terminal) Site
The refined oil project in northeast Thailand includes the construction of a new re-fined oil pipeline, supporting stations and tank farm terminals. The pipeline is 342 kilometers long, passes through 5 provinces, and has a pipe diameter of 16 inches, including the first pump station, and 16 remote control valve rooms, 5 manual valve rooms, 25 HDD crossings and a terminal KKT tank area with 160,000 cubic meters of tank capacity, terminal station, etc.
HCG is responsible for the installation of tank works, piping systems and equip-ment installation at the Khon Kaen Terminal .