THAILAND OPENE PROJECT – KKT TERMINAL
(KHON KAEN TERMINAL,THAILAND)

 

 

Thailand OPENE Project- KKT(Khon Kaen Terminal) Site

          The refined oil project in northeast Thailand includes the construction of a new re-fined oil pipeline, supporting stations and tank farm terminals. The pipeline is 342 kilometers long, passes through 5 provinces, and has a pipe diameter of 16 inches, including the first pump station, and 16 remote control valve rooms, 5 manual valve rooms, 25 HDD crossings and a terminal KKT tank area with 160,000 cubic meters of tank capacity, terminal station, etc.

          HCG is responsible for the installation of tank works, piping systems and equip-ment installation at the Khon Kaen Terminal .


TANK INSTALLTION


PIPING INSTALLTION


STRUCTURE INSTALLTION


PAINTING INSPECTION

WIN WIN STRATEGY
Powered by MakeWebEasy.com
This website uses cookies for best user experience, to find out more you can go to our Privacy Policy  and  Cookies Policy